Show/Hide

Electronic Survey Procedures

Print
Press Enter to show all options, press Tab go to next option

The Building Division has developed a standard operating procedure for you to submit spot surveys electronically as follows:

  • Confirm you have obtained an approved Building – Mono Slab (126) & Electric – Ufer Connection (207) Inspection. (This can be checked online or will be sent to you in an email notification).

  • Send an email to surveys@cityofnorthport.com with the permit application number and “Spot Survey Submittal” on the subject line. Attach a PDF copy of the official sealed survey to the email with the permit number on the survey.

  • Electronic spot survey submittals received prior to 5:00 PM will be processed by the next business day no later than 5:00 PM.

  • Once you have received email notification the Zoning – Spot Survey (819) review has been approved, you will be free to schedule the Building – Tie Beam Or Wall Slab (103) inspection.

Please do not send the spot survey prior to the 126 & 207 inspections being approved in the system. The Zoning Plans Examiners cannot set up or approve the 819 review prior to the 126 & 207 inspections being approved.

To submit final surveys electronically:

  • Send an email to surveys@cityofnorthport.com with the permit application number and “Final Survey Submittal” on the subject line. Attach a PDF copy of the official sealed survey to the email with the permit number on the survey.

  • Electronic final survey submittals will be processed no later than 3 business days after being recieved.

 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Flash Player Download Flash Player Windows Media Player Download Windows Media Player Microsoft Silverlight Download Microsoft Silverlight Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer