Canal & Creek Master Plan-Blueways

Print
Press Enter to show all options, press Tab go to next option

The City of North Port desires to use their existing 85 mile canal system for connectivity, recreation and education. The consultants Kimley Horn and Associates analyzed existing conditions and developed a master plan that would identify opportunities and constraints within the City's canal system, also referred to as Blueways. Navigating around the abundance of water control structures will prove to be a primary obstacle and the plan calls for portage facilities to accommodate circulating around these obstacles. The Canal & Creek Master Plan consists of five phases with the first phase completed in January of 2016. Phase 1 focused on connectivity of water based recreation at Blue Ridge, McKibben, Dallas White, and Butler parks.

In addition to Phase I, a canoe/kayak launch access point was installed on the Snover Waterway behind City Hall. This access point is detailed in Phase 3A of the Canal and Creek Master Plan.

To view the Canal Facilities Master Plan click here.

To view the Blueway Phase I map click here.

Click here for information related to enjoying the City's blueways.

 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Flash Player Download Flash Player Windows Media Player Download Windows Media Player Microsoft Silverlight Download Microsoft Silverlight Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer